🛠Before pouring and concrete pumping we need to prepare site
Before we arrive on site, the area must be fully prepared for concrete pumping. Here’s what proper site prep includes:
✅ Clear access for the pump truck – At least 3 meters (10 ft) wide, no obstacles, mud, or steep slopes. ✅ Flat and stable surface for the pump – No soft spots, holes, or uneven ground. ✅ Clean and open work zone – No debris, boards, tools, or rebar in the way of hose setup. ✅ Formwork is set and checked – No gaps, collapses, or last-minute fixes. ✅ Logistics are planned – From pump setup to pour zone, everything should be accessible. ✅ No bystanders or pets on site – Safety first: no one should be in the way of equipment or crew.
📌 A well-prepared site = fast, smooth, stress-free pouring. Not sure if your site is ready? Just ask us — we’ll guide you.