What should the site look like before concrete pouring?

🛠Before pouring and concrete pumping we need to prepare site

Before we arrive on site, the area must be fully prepared for concrete pumping. Here’s what proper site prep includes:

✅ Clear access for the pump truck – At least 3 meters (10 ft) wide, no obstacles, mud, or steep slopes.
✅ Flat and stable surface for the pump – No soft spots, holes, or uneven ground.
✅ Clean and open work zone – No debris, boards, tools, or rebar in the way of hose setup.
✅ Formwork is set and checked – No gaps, collapses, or last-minute fixes.
✅ Logistics are planned – From pump setup to pour zone, everything should be accessible.
✅ No bystanders or pets on site – Safety first: no one should be in the way of equipment or crew.

📌 A well-prepared site = fast, smooth, stress-free pouring.
Not sure if your site is ready? Just ask us — we’ll guide you.